Nightly Build / build (push) Successful in 9m28s
The previous commit tried to fix the mtime invalidation with `git restore-mtime`. It does not work on this box, in the worst way: the packaged version (2022.12) drives `git whatchanged`, which git 2.53 refuses to run without --i-still-use-this — and the tool swallows that failure and exits 0 having updated nothing. Verified on the runner: "0 commits evaluated, 675 files missing, 0 files updated", while the job happily went on to rebuild everything. Fix the cause instead of the symptom. Both building workflows now sync a tree that survives between runs and build there. `git checkout` only rewrites files whose content actually changed, so mtimes are correct as a consequence rather than as a reconstruction — and no external tool is involved. Gitea serves this repo from the same machine the runner runs on, so the sync reads the bare repo directly: no network, no token. Two properties this buys that restore-mtime did not: - The absolute source path is pinned. The runner derives its workspace path from the job definition, so editing a workflow moved it and invalidated every workspace crate by itself — the previous commit paid that cost without knowing it. - It cannot fail towards staleness. Checking out an older commit stamps those files newer, which costs an extra rebuild; restore-mtime moved mtimes backwards, which could have let cargo reuse artifacts built from newer code. Each workflow gets its own tree, for the same reason they already have their own CARGO_TARGET_DIR: they track different branches, and one shared tree would rewrite half the files on every switch.